Home > Products > All Products > 16 Cavity Hot Ruuner 3 Gallon PET Preform Mold
Products Category
16 Cavity Hot Ruuner 3 Gallon PET Preform Mold

16 Cavity Hot Ruuner 3 Gallon PET Preform Mold

Our factory specializes in manufacturing of 16 Cavity Hot Ruuner 3 Gallon PET Preform Mold, Daelong was set up formally in 1993, as one of the professional China Cap mould manufacturers and China Cap mould suppliers, we are strong strength and complete management. Also, we have own exporting license......

Send Inquiry

Product Description

Our factory specializes in manufacturing of 16 Cavity Hot Ruuner 3 Gallon PET Preform Mold, Daelong was set up formally in 1993, as one of the professional China Cap mould manufacturers and China Cap mould suppliers, we are strong strength and complete management. Also, we have own exporting license. We mainly deal in making a series of Cap mould and so on.


Technical Parameter:

16 cavity Hot ruuner 3 gallon PET Preform Mold use :Germany 2316 with HRC 42-45
Mould core:Germany 2316 with HRC 45-48
Mould neck :Germany 2316 with HRC 45-50
Valve Pin :SKD51 from Japan with HRC 58-60
Hot runner nozzle:America Beryllium copper with HRC 37
Mould manifold plate:H13 from America with HRC 35-38
Mould other plate:P20

Product Details:16cavity Hot ruuner 3 gallon PET Preform Mold

Product Parameter

1.Mold platen steel: P20 Tool steel HRC27-32.

2.Cavity, core & neck rings steel: Germany 2316 with HRC 42-45, high grade with hard treatment up to HRC 50°-54°

3.Interchangeable parts for every cavity.

4.PC-VG Series Valve Grate Hot Runner System.

5.Machine tolerance standards 0.005mm-0.003mm.

6.90% of mold parts interchangeable with injection mold machines.

7.Guaranteed preform wall thickness concentricity:±0.0075mm(L=100mm).

8.Optimized preform design ensures dynamic bottle blowing success.

Product packaging and transportation:

The outer packing with wooden cases by sea transportation.

After-sales service of products:

Our technician can be the buyer’s factory to install and run the mould. But the buyer should bear all the cost for the technician’s trip(include the air ticket, the cost of the accommodation and the salary)

Delivery details:

THE DATE OF DELIEVERY: 50-55 DAYS AFTER GETTING THE DEPOSIT.

THE PORT OF DELIEVERY: NINGBO,CHINA

Related Category

Send Inquiry

Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.
Click Refresh verification code

Leave Your Message

  • Click Refresh verification code